MANAPLA STAFF RESIDENCE

Architect's Concept of the 5 Bedroom
Staff Residence  at our Campus

CONSTRUCTION STARTED EARLY JUNE 2005
SEPTEMBER 8, 2005 UPDATE
BALANCE NEEDED TO COMPLETE:  $25,000.00

I took this long view from the Bible Training Center to show the proximity of the staff residence to our private road and Bible school. (Orange container vans obstruct the view.)

The front porch (center will have 3 steps and lots of landscaping all around the front of the residence, when the construction is completed.

The rear of the residence from the side nearest the Training Center. To the right, room where the male workers will sleep. At center area is the living room. Beyond the yellow cement mixer is Vicky's room, my office and bedroom at the end.

A closer look at the progress on Vicky's room (right), my office (middle) and my bedroom (end.) They were ready to pour the floors in Vicky's bedroom and bathroom when we visited. Soon the roofing tiles will be installed.

This is Vicky's room standing at the rear of the house and her bathroom and closet is at the far end.

View of the back (middle) of the house where the living room is, with Vicky's bedroom on the left side of photo.

My bedroom from the side of the property that has the extreme sloop. Much fill soil is needed here.

At the front of this side is the female worker's room and bathroom, as well as a portion of my bathroom and closet.

From the inside of the kitchen where the floor has already been poured. Behind me is the laundry room and the hallway to the guest room and men worker's quarters.

Back and side of the building that will house our men workers, a guest room and, in the front, the laundry area. The concrete floors were being poured in all these rooms.

 

AUGUST 24, 2005

Front view of house. Note, grading and filling need to be done around the house. About 4-5 feet of fill in the front of the house. Floors begin about 5 feet up. The front entrance, will have 3 steps. The opening is where the floor will be.

View from left side, front. You can estimate that the floors on the inside begin about 4-5 feet from the ground. Much landscaping will be needed  in the front of the house and side due to the sloop of the property.

Side view, with (front to back) laundry, men worker's room and guest room. Only about 2 feet of land fill will be needed on this side. Roof framing has begun, as shown here.

From left back side of house, looking to the far right back. Nearest room is the guest room. Far rooms are Vicky's room, Wanda's office and Wanda's bedroom.

Looking from right back side of house to the left, where the living room, kitchen and dining nook will be at the back of the house. You cannot see the sliding glass door opening to the living room from these pictures.

Looking at the far right, back side of the house with Wanda's office and bedroom (farthest room.) The floor inside starts about 3 feet off the ground here. There will be a sliding glass door in Wanda's bedroom.

Right side, back of the house, where Wanda's bedroom and bath are. Here the sloop requires lots of fill and retaining walls. This view makes it look like a two story structure but it is not.

Right side of the house. Front area is the female worker's room and bath area. We had to put in extra supports here. We will have a carport (far right) under the girl's rooms.

Right side, front view. The car port (opening at the bottom) and above, the girl's rooms. Far right is the front entrance which extends out. More retaining walls will protect the front part of the right side, as well.

Right side, front view brings us back to the front of the house. The house is approximately 361 sq. meters (3,890 sq. feet) without the decking which will be added at a later time.

 

New Manapla Church - Anniversary Service 

This church in Manapla is pastored by LOTWM alumni and is the fruit of our 1999 crusade in Manapla!

Although only one year old, this church has 45+ in regular attendance. I was so honored to minister at this first anniversary observance in June 2000. We feasted on native foods after the morning service! 

The Lord is looking for "fruit that endureth."

 

PRAISE REPORTS:  APRIL - JULY 2000
  

MANAPLA, PHIL. MAY 2000: This was the first night of our second crusade in the city of Manapla where we bought property. At least 50 were saved night one and 20 on night two. Rain caused us to cancel night 3 and accounted for the poor attendance the other nights.

Another crusade this summer outside of Bacolod in Victorias (Canetown.) Night one 122 were saved. At least 198 were saved in this two night crusade. (I really like this dress and wear it a lot! (o:
 Alumnus, Rev. Celino Villarete interpreted for me both nights.

 

MANY SAVED & HEALED AS WE MINISTER
 IN PHILIPPINE CHURCHES

   


I preached at the 9th church Anniversary of good friend, Pastor M. Jamoles in Bacolod City. Approximately 20 were saved and 10-15 rededicated their lives at this service.
 

At this Bacolod church of my close friends, Pastors Emilio and Lori Henares, at least 20 were saved or rededicated their lives at this service I preached. Many were also healed.

Copyright  2007 Light of the World Ministry

 
Click Here if No Directory at 'left'